Services Home Contact us Clients Careers Profile Training
Sp Business Applications
ERP Solutions
Telephone Industry
Database Consulting
Training & Education
Information Engnrg
System Migration
E-Commerce Solutions
Mgmt Consulting
Project Management
Info System Planning
Hardware/Software
Systems Integration
Systems Analysis
Systems Development
Systems Maintenance
S/W Customization
Cost-Benifit Analysis
Project Management


PIXEL Information Technology corporation believes that the central figure in the project is the project manager. He or she bears the ultimate responsibility for the success or failure of the project. Our project management methodology's central focus is the selection of the project management team. We are able to quickly mobilize a competent knowledgeable management team with superior leadership abilities to successfully manage our client's project cost effectively and within budget. Our project management team utilizes the most current state of the art project management tools such as PERT/CPM and probabilistic techniques to ensure the success of our client's projects. Our methodology is based on a four phase approach to project management.

The Four Phases of Project Management

Phase I
Project Evaluation - Determine the result that maximizes the client's return on their investment.
In this phase, different alternatives that can be used to implement the system will be considered and analyzed. The optimum alternative which will provide maximum benefit to the client organization will be determined and used as the building block for the construction of the system.
Phase II
Procurement - Mobilize the resources needed to achieve the desired results.
In this phase, the job analysis and job requirements will be performed and a clear definition of the resources needed to achieve the objective of the project will be stated. Then, the recruiting, interviewing and hiring of these resources will be initiated.
Phase III
Implementation - Begin implementation and obtain the desired result through team work by the project team.
The construction of the system will begin by the programmers and analysts assigned. Proprietary structured software development methodologies will be utilized to develop the planned system. State of the art object oriented methodologies will also be applied if necessary.
Phase IV
Maintenance - Train and assist users at all levels of the organization to provide maximum utility of the project's desired results.
Once the system has been installed at the implementation stage, training and documentation action will begin in preperation for the ongoing maintenance effort which will be required during the lifetime of the system.
Systems documentation will be prepared together with training manuals. Train the trainer sessions will be performed to train those who are going to be responsible for training the end users across the enterprise.

 

© 2004 Designed & Developed by www.pixelinfo.com All rights reserved.